n1

Today's workout.Already built.

n1 builds each session from your recovery, your history and the kit you have. Open it and train.

Open n1 in your browser

Free · Every feature · No card

The n1 workout screen: dumbbell bench press, set 2 of 3, 12.5 kg each hand for 10 reps.
n1 Today screen: readiness 73, Good, train as planned. Today's session, Horizontal, a superset of incline dumbbell press and chest-supported dumbbell row, then n1's pick, and a Start workout button.
The n1 recovery screen: a body figure, front and back, each muscle shaded from fresh to wrecked.

Today

The plan is ready when you open it.

n1 looks at what you trained, how you recovered and what you have to hand. Then it sets the lifts, the weights and the rest. Swap any lift before you start.

n1 Train, Today: a superset of incline dumbbell press, 10 reps at 25 kg, and chest-supported dumbbell row, 12 reps at 35 kg, then an open slot with n1's pick, seal row.

Expert

n1 in Easy mode: Good morning, feeling good, ready to train. Today's workout with one Start button, and the week at 3 of 6 done.

Easy

  • Supersets, set out in rounds.
  • An open slot that n1 fills with its pick.
  • Easy shows one card and one button. Expert shows every set.

Train

One set at a time.

Big numbers, one button. n1 gives you the weight and the reps, times your rest and keeps your records.

The set: dumbbell bench press, set 2 of 3, 12.5 kg each hand, 10 reps, and a Done button.

The set

The weight, the reps and which set you're on. Change a number with one tap.

The rest: a new best on the lat pulldown, 40 kg for 10, a rest timer at 1:56 of 2:00, and the next set.

The rest

A timer for your rest, the next set underneath, and your new best when you set one.

How it felt: five choices from Too easy to Too hard, with Just right picked.

How it felt

Tap how hard the set was. n1 uses it for your next weights.

Recovery

See what's ready.

Every muscle group has its own clock. The body figure shades each one from fresh to wrecked, and the clock learns your pace from your own sets.

  • Fresh
  • Ready
  • Recovering
  • Tired
  • Wrecked

Each morning, a readiness score from 0 to 100 says whether to train as planned.

n1 Recovery: front and back body figures. Most muscles are fresh; the shoulders and lats are recovering. Back is ready on Wednesday at 09:00.

Progress

Progress you can read.

Body, strength, sessions and balance. Plain numbers, one line each, and a forecast for your lifts.

  • Body
  • Strength
  • Sessions
  • Balance
n1 Progress, Strength: goblet squat from 12 to 22 kg, plus 83 percent, with a chart of the estimated max and a forecast.
n1 Progress, Body: weight 71.4 kg, down 1.2 kg over seven weeks, on a line chart with the goal of 66 kg.

Circle

Train with your people.

Add the few people you choose. Share a moment when you want to. Nothing is posted unless you tap Post.

n1 Circle: The Wire, the moments your circle chose to post this week.

Watches

Your wrist is next.

Apple Watch and Wear OS apps arrive with the store release. They are not out yet. This is the screen we are building: the lift, the weight and reps, the set and the rest.

Planned · not out yet

REST1:3012.5 kg × 10
Wear OS
SET 3 OF 4DB bench press12.5kg× 10
Apple Watch

Health data, with the phone apps.

The iPhone and Android apps arrive with the store release too. They read your weight, body fat, resting heart rate and sleep from Apple Health and Health Connect, and write your strength workouts back.

Watches, rings and scales that write to Apple Health or Health Connect count too, for example:

  • Apple Watch
  • Garmin
  • Fitbit
  • Oura
  • Polar
  • Samsung Galaxy Watch
  • Withings

In the browser, n1 can't reach Apple Health or Health Connect. You log your weight and sleep in a few taps.

Free.Every feature.

No subscription. No trial. No card. Everything on this page is in the free app.

All included

  • Today's plan
  • Workout runner
  • Rest timer
  • Records
  • Recovery
  • Readiness
  • Progress
  • Programs
  • Your own plans
  • Cardio and intervals
  • Pull-up path
  • Posture
  • Habits
  • Protein and water
  • Circle
  • Easy and Expert
  • Five languages
  • Your data export

Your data

Your data is not for sale.

Never sold.

We don't sell or rent your data, and we don't share it with ad networks.

Health data stays out of marketing.

Data from Apple Health and Health Connect is never used for advertising or marketing, and never decides which supplement or product you see.

Take it, or delete it.

Download everything in Settings ▸ Data & privacy. Delete your account in Settings ▸ Account.

This website has no trackers and sets no cookies.

Read the privacy policy

Languages

Five languages.

English, Deutsch, Español, Français and Português do Brasil. Switch any time in Settings ▸ Language & time.

The same n1 screen, How did that feel, in English.
English
The same n1 screen, How did that feel, in Deutsch.
Deutsch
The same n1 screen, How did that feel, in Español.
Español
The same n1 screen, How did that feel, in Français.
Français
The same n1 screen, How did that feel, in Português (Brasil).
Português (Brasil)

Your first workout is a few questions away.

Answer a few questions about your training and your kit. n1 builds the first session.

Open n1 in your browser

Free. Runs in the browser on your phone or computer. Add it to your home screen like an app.